📌 B2B Sourcing Overview:
- MOQ: 5 Rolls (Mixed container supported)
- Lead Time: 7-10 Days (Ready stock available for fast shipping)
- Shipping: Support LCL / FCL to global ports (Familiar with Africa/Middle East customs)
- Source: Direct China Factory (EXW / FOB Keqiao)
Why FR Standards Matter for Projects
IFR/FR options · NFPA 701 / EN / BS · MOQ 1 roll · Swatches ~3–14 days · Bulk 20–35 days · Project reports & approvals
Public spaces and hospitality projects require fabrics that comply with fire safety regulations. This guide explains the key test methods and how to prepare documents for fast approvals.
IFR vs FR: What is the Difference?
- IFR (Inherently Flame Retardant): Polymer-level performance; no post finishing required.
- FR (Flame Retardant Finishing): Topical treatment on fabric to meet the standard.
Key Standards
- NFPA 701 (US): Small-scale vertical test for textiles.
- EN 13773 / EN 1101–1103 (EU): European reaction-to-fire tests for curtains.
- BS 5867 (UK): Type B/C performance for drapes and curtains.
Project Documents & Workflow
- Share construction + weight + width and target market.
- We propose IFR/FR route and send swatches (~3–14 days).
- Provide test report (NFPA/EN/BS) and shade approval.
- Bulk production with QC + shade band control; lead time 20–35 days.
FAQ
- Can you supply reports for my project country? Yes—NFPA 701 / EN / BS supported based on destination.
- Will FR performance last? IFR is permanent; FR finishing durability depends on care instructions and use.
- How to get a fast quote? Send destination, widths, target delivery window and Incoterms.
Quick links: Blackout Specs · Sheer Fabrics · Request a Quote (24h)
How This Standards Page Supports The FR Cluster
This page should rank for standard-specific comparison queries. It supports the FR hub and FR guide by answering compliance framework questions, while passing procurement intent to hotel and quote pages.
- Keep standard-by-standard comparison intent here.
- Use the FR hub for category visibility and the FR guide for buying workflow.
- Route project and country demand into the correct downstream pages.
Related pages: FR Hub · FR Guide · Hotel Guide · South Africa · Request Quote
Action: Share your target market, quantity per color, preferred width and destination port through Request Quote to receive the correct spec sheet and shipping route.
